    Interconnection Benefits

    New Mexico Interconnection Rule

    The state of New Mexico has executed Rule 17.9.568 (PDF), otherwise known as Rule 568. The purpose of this rule is to set forth common interconnection requirements and a common interconnection process based on a common screening process for utilities and interconnection customers to expeditiously interconnect generating facilities.

    Bi-Annual Interconnection Report

    Twice annual interconnection report submitted to the PRC providing a categorization of application types and key metrics to demonstrate the efficiency of the Interconnection Process.

    View Report

    Net Metering Benefits (all PV customers)

    The state of New Mexico has executed Rule 17.9.570 (PDF), otherwise known as Rule 570, which provides guidelines for metering qualifying facilities. When your solar system is producing electricity, your billing meter will slow down or may actually spin backwards. (A digital meter will show an arrow blinking left.) At the end of the month, PNM will take a reading and compare it to last months reading. If your solar system produced less than what you used, PNM will bill you for the NET difference. If you produced more than what you used, the NET overproduction will be credited to you in one of two ways:

    • SMALL PV PROGRAM (Inverter capacity of 10kW-AC or less): PNM will credit you the NET overproduction as a Cumulative Renewable Energy Credit (in kWh) on the next month's bill. These credits never expire and, if your system is large enough, can build up during the year and be used later to reduce PNM bills that are high due to things like summer air conditioning. When you close your account, PNM will pay you for any credits remaining on the account at Rate 12, which your can find on pnm.com/rates.
    • LARGE PV PROGRAM (More than 10kW-AC of inverter capacity): PNM will pay for that NET overproduction based on Rate 12 and the payment will be applied on the same bill. NET overproduction is paid each month unlike the cumulative credit in the Small PV Program. You can find Rate 12 on pnm.com/rates.
    • Interconnecting Non-Qualifying Facilities PNM will interconnect with facilities that generate power using less than 75 percent renewable fuels, referred to as "non-qualifying facilities," as long as those facilities comply with both New Mexico Public Regulation Commission (NMPRC) Rule 17.9.568 or 17.9.569 and PNM Interconnection and Safety Standards for Non-Qualifying Facilities (PDF). PNM is not required, however, to purchase energy from a non-qualifying facility. Energy purchase from a non-qualifying facility would be at PNM's discretion with terms and conditions, including metering options, negotiated case by case.

    PNM Interconnection Queue Position

    Per NMAC Rule 17.9.568, PNM shall maintain and publicly post a single queue of projects sortable by geographic region and shall update the list one time per month. The list shall be utilized to determine the cost responsibility for upgrades necessary to accommodate interconnection. Click one of the buttons below to view or download the list.

    Please note, while not subject to NMAC Rule 17.9.568, additional applications to Interconnect are received by PNM. These projects are also placed in the PNM single queue for studies and cost determination. To view the projects in the SGIP queue, please visit the PNM public Oasis site, click Generation Interconnection-Transmission Delivery folder and Status of System Impact Studies sub-folder on the left hand side of the screen. These projects are added to the queue based on the date in the column "Appl Perfected".

    List of Feeders

    Queue Position Project Number Feeder
    1 INT-47917 VNBU41
    2 INT-47938 ELCE11
    3 INT-48247 SCEN11
    4 INT-48281 ELCE11
    5 INT-47920 LD0318
    6 INT-47947 HOND11
    7 INT-48788 TULA14
    8 INT-48786 TULA14
    9 INT-48789 TULA12
    10 INT-48787 TULA13
    11 INT-48791 ELCE11
    12 INT-48280 HOND11
    13 INT-47939 LD0318
    14 INT-54996 GOLD11
    15 INT-56359 AVIL11
    16 INT-61097 GOLD11
    17 INT-62055 RIHO13
    18 INT-62187 FIST13
    19 INT-62412 GOLD11
    20 INT-62429 VERA22
    21 INT-62446 SNVI13
    22 INT-62386 IRIS11
    23 INT-62455 MANZ12
    24 INT-62550 SCEN14
    25 INT-62547 A10089
    26 INT-62469 PROG12
    27 INT-62465 SNVI13
    28 INT-62511 JARA12
    29 INT-62487 VERA11
    30 INT-62609 SOCO12
    31 INT-62268 STPE12
    32 INT-62598 LAMO11
    33 INT-62508 VERA11
    34 INT-62491 MANZ12
    35 INT-62466 IRIS11
    36 INT-62470 PECO11
    37 INT-62633 FOHI12
    38 INT-62604 SCEN14
    39 INT-62667 RIHO13
    40 INT-62587 TULA13
    41 INT-62580 IRIS11
    42 INT-62618 LAMO11
    43 INT-62621 VERA22
    44 INT-62673 PALM14
    45 INT-62672 IRIS11
    46 INT-62684 IRIS13
    47 INT-62646 RITA13
    48 INT-62691 TRAM11
    49 INT-62692 LAWR13
    50 INT-62709 IRIS13
    51 INT-62497 MANZ12
    52 INT-62573 COLL12
    53 INT-62689 IRIS11
    54 INT-62686 IRIS11
    55 INT-62681 SNVI13
    56 INT-62712 LAWR13
    57 INT-62714 VERA11
    58 INT-62727 BLRA11
    59 INT-62563 LAMO11
    60 INT-62286 COLI13
    61 INT-62475 PECO12
    62 INT-62697 STJO11
    63 INT-62730 VERA24
    64 INT-62680 ENHI14
    65 INT-62653 STPE12
    66 INT-62651 VERA22
    67 INT-62755 VERA22
    68 INT-62599 IRIS11
    69 INT-62660 BLRA14
    70 INT-62717 TRAM11
    71 INT-62669 RITA13
    72 INT-62570 RIHO13