For Trade Allies
  • Customer Solar Program
  • Rebates & Discounts
  • Cancel Service
  • Coal
  • Financial Assistance Start Service
  • Energy Saving Tips
  • Geothermal
  • Adding Another Account
  • Save Energy & Money
      href="https://www.pnm.com/fi/student-programs?doAsUserId=...%2F.%2F...%2F.%2F...%2F.%2F...%25%252%3Ca++href%3D%2Fquicklinks%2Fquicklinks%2Fquicklinks%2Foutage%2Fquicklinks" target="" title="Student Programs">li>
    • Manage Alerts
    • Tax Rebate Resources
    Submit Meter Read
  • EV Rebates and Incentives s">lCall Before You Dig
  • PNM Sky Blue
  • Solar & Wind Energy Other Renewable Projects
  • ref="https://www.pnm.com/en/ev-basics?doAsUserId=...%2FF...%2FF.%2F...%2F.%2F...%25F...Conservation%2Fquicklinks%2Foutage%2Fgood-neighbor-fund%2Fquicklinks" target="" title="Personal EVs">Personal EVs
  • More Services
  • For Landlords
  • Manage Account
  • Upgrade Service / New Construction
  • Manage Alerts
  • For Landlords
  • Submit Meter Read
  • Call Before Yo
  • Text Us
  • Manage Alerts
  •  

    Interconnection Benefits

    New Mexico Interconnection Rule

    The state of New Mexico has executed Rule 17.9.568 (PDF), otherwise known as Rule 568. The purpose of this rule is to set forth common interconnection requirements and a common interconnection process based on a common screening process for utilities and interconnection customers to expeditiously interconnect generating facilities.

    Bi-Annual Interconnection Report

    Twice annual interconnection report submitted to the PRC providing a categorization of application types and key metrics to demonstrate the efficiency of the Interconnection Process.

    View Report

    Net Metering Benefits (all PV customers)

    The state of New Mexico has executed Rule 17.9.570 (PDF), otherwise known as Rule 570, which provides guidelines for metering qualifying facilities. When your solar system is producing electricity, your billing meter will slow down or may actually spin backwards. (A digital meter will show an arrow blinking left.) At the end of the month, PNM will take a reading and compare it to last months reading. If your solar system produced less than what you used, PNM will bill you for the NET difference. If you produced more than what you used, the NET overproduction will be credited to you in one of two ways:

    • SMALL PV PROGRAM (Inverter capacity of 10kW-AC or less): PNM will credit you the NET overproduction as a Cumulative Renewable Energy Credit (in kWh) on the next month’s bill. These credits never expire and, if your system is large enough, can build up during the year and be used later to reduce PNM bills that are high due to things like summer air conditioning. When you close your account, PNM will pay you for any credits remaining on the account at Rate 12, which your can find on pnm.com/rates.
    • LARGE PV PROGRAM (More than 10kW-AC of inverter capacity): PNM will pay for that NET overproduction based on Rate 12 and the payment will be applied on the same bill. NET overproduction is paid each month unlike the cumulative credit in the Small PV Program. You can find Rate 12 on pnm.com/rates.
    • Interconnecting Non-Qualifying Facilities PNM will interconnect with facilities that generate power using less than 75 percent renewable fuels, referred to as "non-qualifying facilities," as long as those facilities comply with both New Mexico Public Regulation Commission (NMPRC) Rule 17.9.568 or 17.9.569 and PNM Interconnection and Safety Standards for Non-Qualifying Facilities (PDF). PNM is not required, however, to purchase energy from a non-qualifying facility. Energy purchase from a non-qualifying facility would be at PNM's discretion with terms and conditions, including metering options, negotiated case by case.

    PNM Interconnection Queue Position

    Per NMAC Rule 17.9.568, PNM shall maintain and publicly post a single queue of projects sortable by geographic region and shall update the list one time per month. The list shall be utilized to determine the cost responsibility for upgrades necessary to accommodate interconnection. Click one of the buttons below to view or download the list.

    Please note, while not subject to NMAC Rule 17.9.568, additional applications to Interconnect are received by PNM. These projects are also placed in the PNM single queue for studies and cost determination. To view the projects in the SGIP queue, please visit the PNM public Oasis site, click Generation Interconnection-Transmission Delivery folder and Status of System Impact Studies sub-folder on the left hand side of the screen. These projects are added to the queue based on the date in the column "Appl Perfected".

    List of Feeders

    Queue Position Project Number Feeder
    1 INT-48593 SL0017
    2 INT-48598 TULA13
    3 INT-47917 VNBU41
    4 INT-47938 ELCE11
    5 INT-48247 SCEN11
    6 INT-48284 SL0017
    7 INT-48281 ELCE11
    8 INT-47920 LD0318
    9 INT-47947 HOND11
    10 INT-48788 TULA14
    11 INT-48786 TULA14
    12 INT-48789 TULA12
    13 INT-48787 TULA13
    14 INT-48791 ELCE11
    15 INT-48280 HOND11
    16 INT-56359 AVIL11
    17 INT-59928 ENHI14
    18 INT-60256 ELCE11
    19 INT-59932 STPE13
    20 INT-60277 RIHO13
    21 INT-60433 FIST13
    22 INT-60386 HAMI22
    23 INT-60552 SNVI13
    24 INT-60409 SOCO12
    25 INT-59899 COLI13
    26 INT-60578 VERA11
    27 INT-60462 VERA11
    28 INT-60375 A10012
    29 INT-60128 SOCO12
    30 INT-60026 TULA13
    31 INT-60525 FIST13
    32 INT-60250 VERA22
    33 INT-60577 SNVI13
    34 INT-60459 VERA24
    35 INT-60565 FIST13
    36 INT-60614 MEJI14
    37 INT-60532 RITA13
    38 INT-60616 ELCE12
    39 INT-60638 IRIS13
    40 INT-60644 PECO12
    41 INT-58123 IRON11
    42 INT-58136 IRON11
    43 INT-60647 VERA24
    44 INT-60674 ELDO12
    45 INT-60625 PECO12
    46 INT-60633 SCEN14
    47 INT-60696 FOHI13
    48 INT-60622 RITA13
    49 INT-60707 COLI11
    50 INT-60678 VERA22
    51 INT-60711 STJO11
    52 INT-60667 VERA11
    53 INT-60659 SOCO12
    54 INT-58820 MD0011
    55 INT-60765 INHO13
    56 INT-60778 PROG11
    57 INT-57287 DEMW13
    58 INT-60773 VERA11
    59 INT-60752 UNSE11
    60 INT-60744 HAMI14
    61 INT-60761 PROG13
    62 INT-60789 RIHO13
    63 INT-60351 TULA13
    64 INT-60763 FIST13
    65 INT-60777 SL0017
    66 INT-60747 UNSE11
    67 INT-60784 VERA22
    68 INT-60772 LAMO11
    69 INT-60743 LAMO11
    70 INT-60472 VERA11
    71 INT-60639 FIST13
    72 INT-60788 COLI11