• EV Rebates and Incentives
  •  

    Interconnection Benefits

    New Mexico Interconnection Rule

    The state of New Mexico has executed Rule 17.9.568 (PDF), otherwise known as Rule 568. The purpose of this rule is to set forth common interconnection requirements and a common interconnection process based on a common screening process for utilities and interconnection customers to expeditiously interconnect generating facilities.

    Bi-Annual Interconnection Report

    Twice annual interconnection report submitted to the PRC providing a categorization of application types and key metrics to demonstrate the efficiency of the Interconnection Process.

    View Report

    Net Metering Benefits (all PV customers)

    The state of New Mexico has executed Rule 17.9.570 (PDF), otherwise known as Rule 570, which provides guidelines for metering qualifying facilities. When your solar system is producing electricity, your billing meter will slow down or may actually spin backwards. (A digital meter will show an arrow blinking left.) At the end of the month, PNM will take a reading and compare it to last months reading. If your solar system produced less than what you used, PNM will bill you for the NET difference. If you produced more than what you used, the NET overproduction will be credited to you in one of two ways:

    • SMALL PV PROGRAM (Inverter capacity of 10kW-AC or less): PNM will credit you the NET overproduction as a Cumulative Renewable Energy Credit (in kWh) on the next month¿s bill. These credits never expire and, if your system is large enough, can build up during the year and be used later to reduce PNM bills that are high due to things like summer air conditioning. When you close your account, PNM will pay you for any credits remaining on the account at Rate 12, which your can find on pnm.com/rates.
    • LARGE PV PROGRAM (More than 10kW-AC of inverter capacity): PNM will pay for that NET overproduction based on Rate 12 and the payment will be applied on the same bill. NET overproduction is paid each month unlike the cumulative credit in the Small PV Program. You can find Rate 12 on pnm.com/rates.
    • Interconnecting Non-Qualifying Facilities PNM will interconnect with facilities that generate power using less than 75 percent renewable fuels, referred to as "non-qualifying facilities," as long as those facilities comply with both New Mexico Public Regulation Commission (NMPRC) Rule 17.9.568 or 17.9.569 and PNM Interconnection and Safety Standards for Non-Qualifying Facilities (PDF). PNM is not required, however, to purchase energy from a non-qualifying facility. Energy purchase from a non-qualifying facility would be at PNM's discretion with terms and conditions, including metering options, negotiated case by case.

    PNM Interconnection Queue Position

    Per NMAC Rule 17.9.568, PNM shall maintain and publicly post a single queue of projects sortable by geographic region and shall update the list one time per month. The list shall be utilized to determine the cost responsibility for upgrades necessary to accommodate interconnection. Click one of the buttons below to view or download the list.

    Please note, while not subject to NMAC Rule 17.9.568, additional applications to Interconnect are received by PNM. These projects are also placed in the PNM single queue for studies and cost determination. To view the projects in the SGIP queue, please visit the PNM public Oasis site, click Generation Interconnection-Transmission Delivery folder and Status of System Impact Studies sub-folder on the left hand side of the screen. These projects are added to the queue based on the date in the column "Appl Perfected".

    List of Feeders

    Queue Position Project Number Feeder
    1 INT-48593 SL0017
    2 INT-47917 VNBU41
    3 INT-47938 ELCE11
    4 INT-48247 SCEN11
    5 INT-48284 SL0017
    6 INT-48281 ELCE11
    7 INT-47920 LD0318
    8 INT-47947 HOND11
    9 INT-48788 TULA14
    10 INT-48786 TULA14
    11 INT-48789 TULA12
    12 INT-48787 TULA13
    13 INT-48791 ELCE11
    14 INT-48280 HOND11
    15 INT-56359 AVIL11
    16 INT-61475 SCEN14
    17 INT-61097 GOLD11
    18 INT-61636 SNVI13
    19 INT-56669 ENHI13
    20 INT-62055 RIHO13
    21 INT-62153 GOLD11
    22 INT-62075 UNSE11
    23 INT-62167 COBL12
    24 INT-62004 COLI13
    25 INT-62025 PALM14
    26 INT-62190 BLRA11
    27 INT-61988 COLI13
    28 INT-62172 ENHI14
    29 INT-62214 BLRA14
    30 INT-62133 FOHI13
    31 INT-62185 LAMO11
    32 INT-62179 RIHO13
    33 INT-62227 NOBE13
    34 INT-62177 TRAM11
    35 INT-62238 FIST13
    36 INT-62211 SCEN12
    37 INT-62213 PROG12
    38 INT-62156 COLI11
    39 INT-62188 IRIS11
    40 INT-62194 PROG13
    41 INT-62187 FIST13
    42 INT-62222 FIST13
    43 INT-62223 BLRA14
    44 INT-62239 SNVI13
    45 INT-62253 VERA24
    46 INT-62191 CENT12
    47 INT-62241 LAMO11
    48 INT-62229 BLRA14
    49 INT-62224 VERA24
    50 INT-62272 RIHO13
    51 INT-62298 NOBE13
    52 INT-62294 BLRA11
    53 INT-62265 SNAN22
    54 INT-62184 ELDO12
    55 INT-62276 PALM14
    56 INT-62279 COLI13
    57 INT-62299 BLRA11
    58 INT-62285 SNVI13
    59 INT-62212 PROG12