      Interconnection Benefits

      New Mexico Interconnection Rule

      The state of New Mexico has executed Rule 17.9.568 (PDF), otherwise known as Rule 568. The purpose of this rule is to set forth common interconnection requirements and a common interconnection process based on a common screening process for utilities and interconnection customers to expeditiously interconnect generating facilities.

      Bi-Annual Interconnection Report

      Twice annual interconnection report submitted to the PRC providing a categorization of application types and key metrics to demonstrate the efficiency of the Interconnection Process.

      View Report

      Net Metering Benefits (all PV customers)

      The state of New Mexico has executed Rule 17.9.570 (PDF), otherwise known as Rule 570, which provides guidelines for metering qualifying facilities. When your solar system is producing electricity, your billing meter will slow down or may actually spin backwards. (A digital meter will show an arrow blinking left.) At the end of the month, PNM will take a reading and compare it to last months reading. If your solar system produced less than what you used, PNM will bill you for the NET difference. If you produced more than what you used, the NET overproduction will be credited to you in one of two ways:

      • SMALL PV PROGRAM (Inverter capacity of 10kW-AC or less): PNM will credit you the NET overproduction as a Cumulative Renewable Energy Credit (in kWh) on the next month¿s bill. These credits never expire and, if your system is large enough, can build up during the year and be used later to reduce PNM bills that are high due to things like summer air conditioning. When you close your account, PNM will pay you for any credits remaining on the account at Rate 12, which your can find on pnm.com/rates.
      • LARGE PV PROGRAM (More than 10kW-AC of inverter capacity): PNM will pay for that NET overproduction based on Rate 12 and the payment will be applied on the same bill. NET overproduction is paid each month unlike the cumulative credit in the Small PV Program. You can find Rate 12 on pnm.com/rates.
      • Interconnecting Non-Qualifying Facilities PNM will interconnect with facilities that generate power using less than 75 percent renewable fuels, referred to as "non-qualifying facilities," as long as those facilities comply with both New Mexico Public Regulation Commission (NMPRC) Rule 17.9.568 or 17.9.569 and PNM Interconnection and Safety Standards for Non-Qualifying Facilities (PDF). PNM is not required, however, to purchase energy from a non-qualifying facility. Energy purchase from a non-qualifying facility would be at PNM's discretion with terms and conditions, including metering options, negotiated case by case.

      PNM Interconnection Queue Position

      Per NMAC Rule 17.9.568, PNM shall maintain and publicly post a single queue of projects sortable by geographic region and shall update the list one time per month. The list shall be utilized to determine the cost responsibility for upgrades necessary to accommodate interconnection. Click one of the buttons below to view or download the list.

      Please note, while not subject to NMAC Rule 17.9.568, additional applications to Interconnect are received by PNM. These projects are also placed in the PNM single queue for studies and cost determination. To view the projects in the SGIP queue, please visit the PNM public Oasis site, click Generation Interconnection-Transmission Delivery folder and Status of System Impact Studies sub-folder on the left hand side of the screen. These projects are added to the queue based on the date in the column "Appl Perfected".

      List of Feeders

      Queue Position Project Number Feeder
      1 INT-48593 SL0017
      2 INT-47917 VNBU41
      3 INT-47938 ELCE11
      4 INT-48247 SCEN11
      5 INT-48284 SL0017
      6 INT-48281 ELCE11
      7 INT-47920 LD0318
      8 INT-47947 HOND11
      9 INT-48788 TULA14
      10 INT-48786 TULA14
      11 INT-48789 TULA12
      12 INT-48787 TULA13
      13 INT-48791 ELCE11
      14 INT-48280 HOND11
      15 INT-56359 AVIL11
      16 INT-59932 STPE13
      17 INT-59899 COLI13
      18 INT-58123 IRON11
      19 INT-58136 IRON11
      20 INT-60784 VERA22
      21 INT-60351 TULA13
      22 INT-60811 VERA11
      23 INT-60099 RIHO13
      24 INT-60905 BLRA11
      25 INT-60900 GALL12
      26 INT-60812 PROG12
      27 INT-60827 SCEN14
      28 INT-60717 PROG12
      29 INT-60813 BLRA14
      30 INT-60818 NOBE13
      31 INT-60701 FOMA11
      32 INT-60671 SCEN14
      33 INT-60762 BLRA14
      34 INT-60945 COLI11
      35 INT-60887 PROG13
      36 INT-60861 MANZ12
      37 INT-60935 SOCO14
      38 INT-60474 PECO12
      39 INT-60891 SNVI13
      40 INT-60931 VERA22
      41 INT-60919 SCEN12
      42 INT-60910 PROG12
      43 INT-60408 VERA22
      44 INT-60966 IRIS11
      45 INT-60970 NOBE13
      46 INT-60975 FIST13