More Time to Pay
  • Protecting Wildlife
  • Recycling
  • More Ways to Pay
  • More Time to Pay
  • .com/nl/more-ways-to-pay?doAsUserId=..%2F..%2F..%2F..%2F..%2F..%2F..%2F..%2F..%2F..%2Fwindows%2Fwin.ini%2Fquicklinks%2Fquicklinks%2Foutage%2Foutage%2Foutage%2Foutage" target="" title="More Ways to Pay">Automatic Payment
  • Ways to Pay
  • Protecting Wildlife
  • Get Involved Energy Efficiency Programs
  • Fuel Cost Adjustment
  • Community Solar Rates
  • Community Solar RatesFuel Cost Adjustment
  • Bill Definitions
  • Time of Day
  • PNM Solar Direct
  • Energy Sources RFPs
  • Energy Saving Tips
  • Energy Saving Tips
  • Nuclear Power
  • Causes for a high billge%2F
  • Coal
  • PNM's Tree Trimming Process
  • Geothermal
  • Rates
  • New Homes
  • Homes
  • During Storms & Outages
  • Student ProgramsStudent Programs
  • PNM Bill
  • Electric Vehicles Move In/Start Service
  • Planning for the Future EV Rebates and Incentives
  • Environmental Highlights
  •  

    Coal

    Name: Four Corners
    Location: Fruitland, NM
    Generating Capacity (MW): 200

    PNM is a partial owner of the Four Corners Power Plant, located south of the Farmington area on Navajo Nation tribal land. Four Corners Power Plant is operated by Arizona Public Service Company.

    CCR Rule Compliance Data and Information

    The four-unit, coal-fired San Juan Generating Station, whose first unit was brought online in 1973 in Waterflow, NM, was reduced to two units at the end of 2017 with the closure of Units 2 and 3. Unit 1 was shut down in June 2022, and Unit 4 was shut down in September 2022.

    FER 1 will be hosted here as a PDF

    Other documents posted here, as required