        Interconnection Benefits

        New Mexico Interconnection Rule

        The state of New Mexico has executed Rule 17.9.568 (PDF), otherwise known as Rule 568. The purpose of this rule is to set forth common interconnection requirements and a common interconnection process based on a common screening process for utilities and interconnection customers to expeditiously interconnect generating facilities.

        Bi-Annual Interconnection Report

        Twice annual interconnection report submitted to the PRC providing a categorization of application types and key metrics to demonstrate the efficiency of the Interconnection Process.

        View Report

        Net Metering Benefits (all PV customers)

        The state of New Mexico has executed Rule 17.9.570 (PDF), otherwise known as Rule 570, which provides guidelines for metering qualifying facilities. When your solar system is producing electricity, your billing meter will slow down or may actually spin backwards. (A digital meter will show an arrow blinking left.) At the end of the month, PNM will take a reading and compare it to last months reading. If your solar system produced less than what you used, PNM will bill you for the NET difference. If you produced more than what you used, the NET overproduction will be credited to you in one of two ways:

        • SMALL PV PROGRAM (Inverter capacity of 10kW-AC or less): PNM will credit you the NET overproduction as a Cumulative Renewable Energy Credit (in kWh) on the next month¿s bill. These credits never expire and, if your system is large enough, can build up during the year and be used later to reduce PNM bills that are high due to things like summer air conditioning. When you close your account, PNM will pay you for any credits remaining on the account at Rate 12, which your can find on pnm.com/rates.
        • LARGE PV PROGRAM (More than 10kW-AC of inverter capacity): PNM will pay for that NET overproduction based on Rate 12 and the payment will be applied on the same bill. NET overproduction is paid each month unlike the cumulative credit in the Small PV Program. You can find Rate 12 on pnm.com/rates.
        • Interconnecting Non-Qualifying Facilities PNM will interconnect with facilities that generate power using less than 75 percent renewable fuels, referred to as "non-qualifying facilities," as long as those facilities comply with both New Mexico Public Regulation Commission (NMPRC) Rule 17.9.568 or 17.9.569 and PNM Interconnection and Safety Standards for Non-Qualifying Facilities (PDF). PNM is not required, however, to purchase energy from a non-qualifying facility. Energy purchase from a non-qualifying facility would be at PNM's discretion with terms and conditions, including metering options, negotiated case by case.

        PNM Interconnection Queue Position

        Per NMAC Rule 17.9.568, PNM shall maintain and publicly post a single queue of projects sortable by geographic region and shall update the list one time per month. The list shall be utilized to determine the cost responsibility for upgrades necessary to accommodate interconnection. Click one of the buttons below to view or download the list.

        Please note, while not subject to NMAC Rule 17.9.568, additional applications to Interconnect are received by PNM. These projects are also placed in the PNM single queue for studies and cost determination. To view the projects in the SGIP queue, please visit the PNM public Oasis site, click Generation Interconnection-Transmission Delivery folder and Status of System Impact Studies sub-folder on the left hand side of the screen. These projects are added to the queue based on the date in the column "Appl Perfected".

        List of Feeders

        Queue Position Project Number Feeder
        1 INT-48593 SL0017
        2 INT-47917 VNBU41
        3 INT-47938 ELCE11
        4 INT-48247 SCEN11
        5 INT-48284 SL0017
        6 INT-48281 ELCE11
        7 INT-47920 LD0318
        8 INT-47947 HOND11
        9 INT-48788 TULA14
        10 INT-48786 TULA14
        11 INT-48789 TULA12
        12 INT-48787 TULA13
        13 INT-48791 ELCE11
        14 INT-48280 HOND11
        15 INT-56359 AVIL11
        16 INT-61215 IRIS11
        17 INT-61195 COLL11
        18 INT-61307 VERA22
        19 INT-61475 SCEN14
        20 INT-61097 GOLD11
        21 INT-61375 PCMN14
        22 INT-61609 IRIS11
        23 INT-61620 VERA24
        24 INT-61612 VERA22
        25 INT-61388 ELCE11
        26 INT-61653 BLRA14
        27 INT-61636 SNVI13
        28 INT-61530 SCEN12
        29 INT-56669 ENHI13
        30 INT-61560 A10089
        31 INT-61742 SOPA27
        32 INT-61757 NOBE13
        33 INT-61595 RIHO13
        34 INT-61708 CENT12
        35 INT-61673 VERA11
        36 INT-61721 NOBE13
        37 INT-61159 CENT13
        38 INT-61781 A10083
        39 INT-61740 VERA11
        40 INT-61675 BUCK23