• Energy Sources Wind
  • Coal
  • Customer Solar Program
  • Definitions
  • Geothermal
  • For Manufacturers
  • Nuclear Power
  • Personal EVs
  • Solar
  • RFPs
  • Go Paperless
  • RFPs
  • Coal
  • Business Fleet EVs
  • Causes for a high bill
  • Electric Vehicles
  • EV Updates
  • gy Saving Tips
  • EV Updates
  • EV Updates
  • Developer Information
  • Drive Electric with PNM | Save Money & Go Green
  • Drive Electric with PNM | Save Money & Go Green
  • Drive Electric with PNM | Save Money & Go Green
  • href="https://www.pnm.com/zh/home-weatherization-assistance?doAsUserId=...%2F.%2F...Rate...%2F.%2F...%2F.%2F...%2F.%252ref%3D%252Rebates%2Fquicklinks%2Fquicklinks%2Fquicklinks" target="" title="Home Weatherization Assistance">Home Weatherization Assistance
  • Drive Electric with PNM | Save Money & Go Green
  • PNM Sky Blue
  • EV Tax Credit
  • EV Tax Credit
  • EV Tax Credit
  • EV Tax Credit
  • Customer Solar Program
  • DC Fast Charging
  • DC Fast ChargingdeOther Renewable ProjectsDC Fast ChargingNew Homes
  • Planning for the Future
  •  

    Coal

    Name: Four Corners
    Location: Fruitland, NM
    Generating Capacity (MW): 200

    PNM is a partial owner of the Four Corners Power Plant, located south of the Farmington area on Navajo Nation tribal land. Four Corners Power Plant is operated by Arizona Public Service Company.

    CCR Rule Compliance Data and Information

    The four-unit, coal-fired San Juan Generating Station, whose first unit was brought online in 1973 in Waterflow, NM, was reduced to two units at the end of 2017 with the closure of Units 2 and 3. Unit 1 was shut down in June 2022, and Unit 4 was shut down in September 2022.

    FER 1 will be hosted here as a PDF

    Other documents posted here, as required