Contact PNM | About PNM | PNM News


Electricity Rates

These rates are for customers in Bernalillo County, Clayton, Deming, Las Vegas, Sandoval County, Santa Fe County, Valencia County.

Rate Description
Residential
Non-
residential
1A Residential service
x
 
1B Residential service
time-of-use rate

x
 
2A Small power service
 
x
2B Small power service
time-of-use rate

 
x
3B General power service
time-of-use rate

 
x
3C General power service (low load factor) time-of-use rate   x
4B Large power service
time-of-use rate

 
x
5B Large service for mining customers for service >= 8,000 kW minimum at 115 kV
 
x
6 Private area lighting service
x
x
10A Irrigation service
 
x
10B Irrigation service
time-of-use rate

 
x
11B Water and sewage pumping service
time-of-use rate
 
x
12 Cogeneration and small
power production

x
x
14B Large service for mining customers for service >= 8,000 kW minimum at 115 kV
 
x
15B Large service for public universities > 8,000 kW minimum at 115 kV
 
x
16 Special charges
x
x
17B Large service for manufacturing
for service >=  8,000 kW minimum at primary distribution voltage

 
x
20 Integrated system
streetlighting and floodlighting service - new installations

 
x
22 Underground system special services
 x
 x
23 Special contract service for large customers
 
 x
24 Small photovoltaic renewable energy certificate
 x
 x
30B Large service for manufacturing
for service >=  30,000 kw minimum at distribution voltage

 
x
31 Large Photovoltaic Renewable Energy Certificate x x
Rider 8 Incremental interruptible
power rate applicable
to rates 3B and 4B

 
x
Rider 10 Palo Verde refinancing
credit rider applicable
to retail energy rate schedules

x
x
Rider 11 Voluntary renewable energy
x
x
Rider 12 Rio Rancho 2003 underground projects
x
x
Rider 13 Rio Rancho 2005 / Unser widening underground projects
 x
x
Rider 14 Rio Rancho 2006 underground project
x
x
Rider 16 Energy efficiency
x
x
Rider 18 City of Santa Fe 2007 underground projects
x
x
Rider 19 2007 Santa Fe County underground projects
x
x
Rider 20 Synergy savings rider
x
x
Rider 22 2008 Rio Rancho underground projects x x
Rider 23 Fuel and purchased power cost adjustment clause ("FPPCAC") applicable to retail energy rate schedules x x
Rider 24 Net metering service x x
Rider 26 2009 Santa Fe County underground project x x
Rider 27 S02 credit x x
Rider 28 2009 City of Rio Rancho Underground Projects x x