Tree and Brush Trimming: ES-1.0 (.pdf)
Maximum Available Fault Currents: DM-4-11.0 (.pdf)
Attachment of Service to Riser: DS-4-3.0 (.pdf)
Attachment of Service to Building: DS-4-4.0 (.pdf)
Minimum Point of Attachment Height for Service Drop Cables: DS-4-4.5 (.pdf)
Underground Service Entrance: DS-4-5.0 (.pdf)
Permanent Service Entrance (can be used for Temporary Service): DS-4-5.5 page 1 (.pdf)
Permanent Service Entrance (can be used for Temporary Service): DS-4-5.5 page 2 (.pdf)
Remote Temporary Meter Pole: DS-4-5.7 (.pdf)
120/240V Underground Construction Service Pole: DS-4-6.0 (.pdf)
Single-Phase Customer Owned Riser on Customer Owned Residential Service Pole: DS-4-7.0 (.pdf)
Overhead Permanent/Temporary Single-Phase or Temporary Three-Phase Service Pole: DS-4-8.0 (.pdf)
200A Temporary Three-Phase Pedestal Metering: DS-4-8.5 (.pdf)
Underground Residential Customer-Owned Service: DS-4-9.0 (.pdf)
Underground Residential Customer-Owned Service on PNM Owned Secondary Pole: DS-4-9.3 (.pdf)
Underground Commercial Customer-Owned Service: DS-4-9.5 (.pdf)
120/240V Underground Single-Phase Commercial Pedestal Metering: DS-4-10.0 (.pdf)
Single-Phase Padmounted Transformer Commercial Application : DS-7-14.0 (.pdf)
Three-Phase Padmounted Transformer Customer-Installed: DS-7-15.0 (.pdf)
Three-Phase Padmounted Primary Meter and Switchgear Customer Installed: DS-7-15.1 (.pdf)
Three-Phase Padmounted Transformer From Padmounted Switchgear: DS-7-15.2 (.pdf)
Three-Phase Padmounted Primary Meter and Padmounted Switchgear: DS-7-15.3 (.pdf)
Single-Phase Padmounted Transformer From Padmounted Switchgear: DS-7-15.4 (.pdf)
25-167 kVa Single-Phase Box Pad: DS-7-16.1 (.pdf)
75-500 kVA Three-Phase Radial Fed Transformer Pad: DS-7-16.5 (.pdf)
750-1500 kVA Three-Phase Radial Fed Transformer Pad: DS-7-16.6 (.pdf)
75-500 kVA Three-Phase Loop Fed Transformer Pad: DS-7-16.7 (.pdf)
750-1500 kVA Three-Phase Loop Fed Transformer Pad: DS-7-16.7.1 (.pdf)
Guard Post: DS-7-16.10 (.pdf)
Minimum Working Space and Fire Safety Requirements for Transformers: DS-7-16.12 (.pdf)
Working Space and Fire Safety Requirements General Notes: DS-7-17.0 (.pdf)
75-150 kVA Radial Fed Transformer and Metering Enclosure Pad: DS-7-17.5 (.pdf)
75-750 kVA Loop Fed Transformer and Metering Enclosure Pad: DS-7-17.6 (.pdf)
300-500 kVA Radial Fed Transformer and Metering Enclosure Pad: DS-7-17.8 (.pdf)
750-1500 kVA Radial Fed Transformer and Metering Enclosure Pad: DS-7-17.9 (.pdf)
Working Space Required for Padmounted Switchgear: DS-9-17.0 (.pdf)
200 Amp Tangent Riser Three-Phase 1/10, Three 2" Conduits: DS-10-6.45 (.pdf)
Trench Details: DS-10-8.0 page 1 (.pdf)
Trench Details: DS-10-8.0 page 2 (.pdf)
Trench Details: DS-10-8.0 page 3 (.pdf)
Trench Details: DS-10-8.0 page 4 (.pdf)
Trench Details: DS-10-8.0 page 5 (.pdf)
Trench Details: DS-10-8.0 page 6 (.pdf)
Trench Details: DS-10-8.0 page 7 (.pdf)
Trench Details: DS-10-8.0 page 8 (.pdf)
Clearances from Buildings and Other Structures: DS-13-2.0 page 1 (.pdf)
Clearances from Buildings and Other Structures: DS-13-2.0 page 2 (.pdf)
Clearances from Buildings and Other Structures: DS-13-2.0 page 3 (.pdf)
Clearances from Lighting and Traffic Light Supports and Structures of a Second Line: DS-13-2.3 (.pdf)
Vertical Clearances Above Ground, Roadway, Rail or Water Surfaces: DS-13-2.5 page 1 (.pdf)
Vertical Clearances Above Ground, Roadway, Rail or Water Surfaces: DS-13-2.5 page 2 (.pdf)
Vertical Clearances Above Ground, Roadway, Rail or Water Surfaces: DS-13-2.5 page 3 (.pdf)
Swimming Pool Clearance - Overhead: DS-13-6.0 (.pdf)
Swimming Pool Clearance - Underground: DS-13-7.0 (.pdf)
Service for Hazardous Areas: DS-13-8.0 (.pdf)
Clearances for Gasoline and LPG Filling Station: DS-13-8.5 (.pdf)
Ground Assembly: DS-18-20.0 page 1 (.pdf)
Ground Assembly: DS-18-20.0 page 2 (.pdf)
Universal Support Brackets: DS-18-22.0 (.pdf)
Electric Service Guide: meter drawings Complete 2011 Electric Service Guide in single document (.pdf)