Electric Service Guide:
Construction Drawings
Tree and Brush
Trimming: ES-1.0 (.pdf)
Maximum Available Fault Currents: DM-4-11.0 (.pdf)
Attachment
of Service to Riser: DS-4-3.0 (.pdf)
Attachment
of Service to Building: DS-4-4.0 (.pdf)
Minimum Point
of Attachment Height for Service Drop Cables: DS-4-4.5 (.pdf)
Underground
Service Entrance: DS-4-5.0 (.pdf)
Permanent
Service Entrance (can be used for Temporary Service): DS-4-5.5
page 1 (.pdf)
Permanent Service Entrance
(can be used for Temporary Service): DS-4-5.5 page 2 (.pdf)
Remote Temporary
Meter Pole: DS-4-5.7 (.pdf)
120/240V Underground
Construction Service Pole: DS-4-6.0 (.pdf)
Single-Phase
Customer Owned Riser on Customer Owned Residential Service
Pole: DS-4-7.0 (.pdf)
Overhead Permanent/Temporary
Single-Phase or Temporary Three-Phase Service Pole: DS-4-8.0
(.pdf)
200A Temporary
Three-Phase Pedestal Metering: DS-4-8.5 (.pdf)
Underground
Residential Customer-Owned Service: DS-4-9.0 (.pdf)
Underground
Residential Customer-Owned Service on PNM Owned Secondary Pole: DS-4-9.3 (.pdf)
Underground
Commercial Customer-Owned Service: DS-4-9.5 (.pdf)
120/240V
Underground Single-Phase Commercial Pedestal Metering: DS-4-10.0
(.pdf)
Single-Phase
Padmounted Transformer Commercial Application : DS-7-14.0
(.pdf)
Three-Phase
Padmounted Transformer Customer-Installed: DS-7-15.0 (.pdf)
Three-Phase
Padmounted Primary Meter and Switchgear Customer Installed:
DS-7-15.1 (.pdf)
Three-Phase
Padmounted Transformer From Padmounted Switchgear: DS-7-15.2
(.pdf)
Three-Phase
Padmounted Primary Meter and Padmounted Switchgear: DS-7-15.3
(.pdf)
Single-Phase
Padmounted Transformer From Padmounted Switchgear: DS-7-15.4
(.pdf)
25-167 kVa
Single-Phase Box Pad: DS-7-16.1 (.pdf)
75-500 kVA
Three-Phase Radial Fed Transformer Pad: DS-7-16.5 (.pdf)
750-1500
kVA Three-Phase Radial Fed Transformer Pad: DS-7-16.6 (.pdf)
75-500 kVA
Three-Phase Loop Fed Transformer Pad: DS-7-16.7 (.pdf)
750-1500
kVA Three-Phase Loop Fed Transformer Pad: DS-7-16.7.1 (.pdf)
Guard Post:
DS-7-16.10 (.pdf)
Minimum
Working Space and Fire Safety Requirements for Transformers:
DS-7-16.12 (.pdf)
Working
Space and Fire Safety Requirements Supplement: DS-7-17.0
page 1 (.pdf)
Working
Space and Fire Safety Requirements Supplement: DS-7-17.0 page
2 (.pdf)
75-150 kVA
Radial Fed Transformer and Metering Enclosure Pad: DS-7-17.5
(.pdf)
75-750 kVA
Loop Fed Transformer and Metering Enclosure Pad: DS-7-17.6
(.pdf)
300-500 kVA
Radial Fed Transformer and Metering Enclosure Pad: DS-7-17.8
(.pdf)
750-1500
kVA Radial Fed Transformer and Metering Enclosure Pad: DS-7-17.9
(.pdf)
Working Space
Required for Padmounted Switchgear: DS-9-17.0 (.pdf)
Trench
Details: DS-10-8.0 page 1 (.pdf)
Trench
Details: DS-10-8.0 page 2 (.pdf)
Trench
Details: DS-10-8.0 page 3 (.pdf)
Trench
Details: DS-10-8.0 page 4 (.pdf)
Trench
Details: DS-10-8.0 page 5 (.pdf)
Trench
Details: DS-10-8.0 page 6 (.pdf)
Trench Details: DS-10-8.0 page 7 (.pdf)
Trench
Details: DS-10-8.0 page 8 (.pdf)
Clearances from Buildings and Other Structures: DS-13-2.0
page 1 (.pdf)
Clearances from Buildings and Other Structures: DS-13-2.0
page 2 (.pdf)
Clearances
from Buildings and Other Structures: DS-13-2.0 page 3
(.pdf)
Clearances
from Lighting and Traffic Light Supports and Structures of
a Second Line: DS-13-2.3 (.pdf)
Vertical
Clearances Above Ground, Roadway, Rail or Water Surfaces:
DS-13-2.5 page 1 (.pdf)
Vertical
Clearances Above Ground, Roadway, Rail or Water Surfaces:
DS-13-2.5 page 2 (.pdf)
Vertical
Clearances Above Ground, Roadway, Rail or Water Surfaces:
DS-13-2.5 page 3 (.pdf)
Swimming
Pool Clearance - Overhead: DS-13-6.0 (.pdf)
Swimming
Pool Clearance - Underground: DS-13-7.0 (.pdf)
Service for
Hazardous Areas: DS-13-8.0 (.pdf)
Clearances
for Gasoline and LPG Filling Station: DS-13-8.5 (.pdf)
Ground
Assembly: DS-18-20.0 page 1 (.pdf)
Ground
Assembly: DS-18-20.0 page 2 (.pdf)
Universal
Support Brackets: DS-18-22.0 (.pdf)
|